Our Client

The enterprise is India’s largest construction company. It emerged as the L1 bidder for building the bulk material transportation system for a thermal power plant in Khurja, Bulandshahr district, Uttar Pradesh. Moglix intervened as a supply chain solution provider for multiple fabrication requirements such as forging, welding, grinding, blasting, painting, and onsite installation for 73 MT of multiple line items.

Business Challenges

  • Fabrication of boiler bunker floor
  • Fabrication of rail supporting girder
  • Fabrication of chute and conveyor
  • Trial assembly of fabricated structures
  • Onsite installation of the structures
73
MT of Boiler Bunker Floor, Chute, and Conveyor Fabricated Get In Touch

Solution

Explore how Moglix is enabling 100% GFC fabrication for a thermal power plant in Uttar Pradesh
DOWNLOAD CASE STUDY

Industries & Impact

Enabling agile MRO procurement at scale through workflow digitization

Digitize_Casestudy_Construction

Enabling agile MRO procurement at scale through workflow digitization Download Case Study
Getting Indian Businesses Prepared for Restarting the Supply Chain During Lockdown 4.0
Getting Indian Businesses Prepared for Restarting the Supply Chain During Lockdown 4.0 Read More
Now and Next in the Infrastructure Sector
Now and Next in the Infrastructure Sector Listen Now
Ebook Download Graph

Get Your Free Ebook on Procurement & Supply Chain Insights 2021.

Stay ahead of industry trends in 2021. Read how Indian manufacturing is going to become more self-reliant from the industry leaders and much more.

[contact-form-7 404 "Not Found"]